Entertainment Producers  
Register for news letter


Google This Site

DVD NOW AVAILABLE
RAS NOAH AND THE HAWK
PUPPY LOVE
VIBES
CLASS OF '73
 
LINKS
Theatre Workshop
Actors Corner
Jamaican Plays

Name:
Email:
-----
Technical Requirement

RIVER BOTTOM

TECHNICAL REQUIREMENTS

“River Bottom” is set in a clearing by a river bank in Jamaica

A) The Set Units include :      - Backdrop (34’ x 25’)
                                                - Scenic Rocks
                                                - Scenic Foliage
                                                - Fishing Nets
                                                - Fishing Boat
                                                - A Shop

  1. (Act 2 Sc. 2) The Underwater Scene.  The following elements are required:
    1. A Translucent Scrim (to be located Downstage – filling the proscenium opening)
    2. Three (3) Projectors that project a 53° - beam water effect in a range of colours at a user selectable speed.  Recommendation – Martin Mania DC 1 or equivalent
    3. Blue Stage Lights (washing entire stage area behind Scrim)

C)  Lighting    (a)  Moods       - Daylight
                                                - Night
                                                - Twilight
                                                - Deep Amber Wash

                        (b)  Specials     - Overhead Amber Spot (Up Centre)
                                                - White Spot (Down Centre)
                                                - Mirror – Ball (Blue / Amber effect)

D)  Sound       (a) Nine (9) Lav Microphones
                        (b) Two (2) Monitors (Left, Right Stage)
                        (c) One (1) CD Player with facility to mix two CDs
(d) House Audio System sufficient to reinforce sound coming from the stage

PROP ITEMS TO BE PROVIDED BY OVERSEAS PROMOTER FOR OVERSEAS PROFOMANCE

Copyright © 2003-2006. JamBiz International Limited. All rights reserved.